论文部分内容阅读
江苏省江阴机电厂与郑州铁路分局及郑州水电段协作改制的800×1600mm 大型电渗析装置,安装于商邱西站软水所进行生产试验,原水含盐量1100~1300mg/L,流量35~40m~3/h,进水压力1.5~1.7kgf/cm~2,除盐率为65%,经过几个月的运行,生产性能稳定。1985年4月10日,江阴县科委邀请铁道部基建总局、各勘测设计公司和有关铁路局、分局、水电段、机务段及路外有关院校、科研、设计、使用等43个单位的70名代表,参加了商邱大型电渗析评审会议。与会代表一致认为,该电渗析装置符合原设计工艺参数,其特点是配水结构新颖、水流阻力小,有利于在大、中型水站推广应用。4月11日,郑州铁路分局与江阴县科委又共同组织召开了“电渗析给水处理应用技术经验交流会”,参加评审会的全体代表出席了会议,共交流了电渗析应用技术论文21篇。会上,有郑州
The 800 × 1600mm large electrodialysis unit co-operated by Jiangsu Jiangyin Power Plant, Zhengzhou Railway Sub-bureau and Zhengzhou Hydropower Station is installed in the production test of soft water in Shangqiu West Station. The raw water has a salt content of 1100-1300mg / L and a flow rate of 35-40m ~ 3 / h, inlet pressure 1.5 ~ 1.7kgf / cm ~ 2, desalination rate of 65%, after several months of operation, stable production performance. April 10, 1985, Jiangyin County Science and Technology Commission invited the Ministry of Railways Infrastructure Bureau, the survey and design companies and the relevant railway bureau, branch, water and electricity section, the depot and the relevant institutions, scientific research, design, use 43 units 70 delegates attended the large electrodialysis review meeting in Shangqiu. Delegates agreed that the electrodialysis device meets the original design process parameters, which is characterized by a novel water distribution structure, water flow resistance is small, is conducive to the promotion of large and medium-sized water stations. On April 11, Zhengzhou Railway Branch and Jiangyin County Science and Technology Commission jointly organized and convened the “Experience Seminar on Electrodialysis Water Treatment Application Technology”. All the participants who attended the review meeting attended the meeting and exchanged 21 papers on the application of electrodialysis . At the meeting, Zhengzhou