论文部分内容阅读
“九五”期是珠江航道发展最快的时期,特点是航道建设投入多,养护管理进一步规范化,技术含量高,依法治航成效大,体制改革迈大步。 1.航道建设进程加快 珠江水系航道在流域省(区)国民经济的基础作用和地位进一步提高,“九五”期是历史上珠江航道建设投资最大,发展最快的时期。 珠江水系航道建设重点是全国水运主通道总体布局规划“两横一纵两网”中的“一横一网”。主要项目有:西江二期工程、西江下游3000吨级海轮航道、西南水运出海中线通道、珠江三角洲航
The “Ninth Five-Year” period is the fastest-growing period of the Pearl River Waterway. It is characterized by a large investment in waterway construction, further standardization of conservation and management, high technical content, effective governance by air and great strides in institutional reform. 1. The process of waterway construction speeding up The Pearl River waterway in the drainage basin (area) national economy, the basic role and status to further improve the “Ninth Five-Year” period is the history of the Pearl River Waterway construction investment in the largest and fastest-growing period. The focus of the Pearl River waterway construction is the “one horizontal one network” in the “two horizontal and one vertical two networks” overall layout plan of the national main waterway. The main projects are: the second phase project of the Xijiang River, the 3000-ton marine waterway in the lower reaches of the Xijiang River, the mid-water passageway to the southwest, the Pearl River Delta Delta