煤气站和鍋爐房燃料供应的机械化运輸設計,在整个煤气站和鍋爐房的設計中是一个不可缺少的部分,它在綫路布置上虽然不像鑄工机械化那样复杂,但是如果方案布置得不好或者設备选擇得不当,也往往会給生产上帶来很多麻煩。可以根据工艺的要求、場地的限制等条件,組成各式各样的燃料供应运輸綫路,选用各种不同的运輸設备。在运輸量較大而又要求保証能及时可靠地供应燃料的情况下,可以用双綫制,双线制就是整个运輸系統的設备都用兩套,其中一套备用。在一般情况下,單綫制已足夠应用,但其运輸工作要能保証每晝夜不超过16小时,也就是說每天至少要有八小时不进行工作。
The mechanized transport design of the gas station and boiler room fuel supply is an integral part of the design of the entire gas station and boiler room. Although it is not as complicated as the caster mechanization, it is not well-planned. Or improperly selected equipment can also cause a lot of trouble in production. According to the requirements of the process, site constraints and other conditions, to form a variety of fuel supply and transportation lines, use a variety of different transport equipment. In the case of a large volume of transportation and requiring that fuel be supplied in a timely and reliable manner, a two-wire system may be used. The two-wire system means that the entire transportation system uses two sets of equipment, one of which is set aside. Under normal circumstances, the single-line system is sufficient, but its transportation work must be able to guarantee that it does not exceed 16 hours per day, that is, at least eight hours a day without work.