Watcr Security Situation in Haihc Rivcr Basin after South-to-North Watcr Transfer Project

来源 :中国科学院院刊:英文版 | 被引量 : 0次 | 上传用户:jishume
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3. It is important to note that the exploitation of water resources in HRB was reasonable before 1979. After 1980, however, over-exploitation happened with an annual average amount of 40×10^8m^3. Both the dry season and rapid economic growth in HRB took place at the same time. Therefore, the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth. So the over-exploitation would not be as serious as it is today if either of the above two stopped. After the first stage of south-to-north water transfer project, the water shortage problem in HRB could be eased for the following reasons: firstly, water transfer project will bring to the Basin 60x108m3 water resources; secondly, a wet season will come back eventually according to natural law of climate variability; finally, its agricultural and industrial use and total water consumption all have decreased from the peak value, so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored. In the future, the main problem of water resources security in HRB will include water pollution, operation risk of the south-to-north water transfer project, groundwater pollution and engineering geological hazards that may be brought by groundwater rise. The proposed countermeasures are as follows: keeping strengthening water demand management, raising water price as well as subsidies for the low- income family and improving other water related policies, preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project.
其他文献
近年来,随着经济建设的飞速发展,我国的高速公路建设如火如荼的开展起来.桥梁作为公路建设的重要组成部分,在交通事业迅速发展的今天,常常由于承载能力不足而引发桥梁病害,进
根据作者多年工作经验,公路桥梁不仅要经受自然环境的破坏,还要接受日益沉重的交通负荷.为了节省建设资金投入,确保桥梁质量,推动建筑业的可持续发展,对原有桥梁进行加固是十
数学教材是数学教学内容和方法的载体.教材编写得是否科学,是否适合初中学生的认知特点,对数学教学有很大的影响.本文通过对浙教版数学新教材的研究,提出一些困惑与思考.
公路是一个国家的血脉,国家地理情况越复杂,那么这个国家的公路构造也会越需要有条理性的结构.我国由于本身地广人多的地理环境,使得我国公路建造数位居世界的前列.对公路的
随着科学技术的进步和经济的快速发展,地区与地区的联系日益紧密.现代化的交通路线成为当前最重要的,也最便捷的连接方式.从近些年的铁路交通枢纽的发展情况来看,隧道工程越
本文主要通过极大理想空间与乘法线性泛函的核空间的关系,给出了真理想存在性的一个判别方法.
“交通建设工程工地试验室管理体系研究”通过对广东省交通建设工程的工地试验室现状及存在问题进行研究,从全省交通建设实际出发,提出了解决目前问题的对策和建议措施;针对工地
综合日语课是我院商务日语专业的一门基础课程,开课时间覆盖整个基础阶段四个学期。其教学效果直接影响学生们的学习质量。找到适合自己和学生们的教学方法,就一定会调动师生
本文设计了一种基于GSM的配网自动数据采集系统,利用GSM模块(TC35i)和AVR单片机实现了配电网的远程无线数据采集方案。利用GMS通信技术在数据传输方面的优势,使系统具有较好
CAS inaugurated its Center for Water Resources Research in 2006 with an objective to bring together R&D resources housed in different CAS institutes so as to pla