论文部分内容阅读
在大跃进的形势下,赢得时间就是胜利。迅速地解决初步设计中的埧段和埧軸綫的选择问题,对于争取水电建建工程的早日开工具有很重要的意义。而这一关鍵问题的解决,最重要一点是要贯彻政治挂帅和群众路綫的工作方法,勘测设计人员大家思想解放,坚持多快好省的原则,在工作中紧紧地依靠地方,处处深入实地,特别是组繊有关單位至工地会审,在現場討論,是一个很有效的工作方法。这篇文章介紹武汉水电設計院一些工作經驗是值得参考的。
In the Great Leap Forward situation, winning time is victory. It is of great significance to quickly resolve the selection of the first section and the second axis in the preliminary design for the early-day opening of the hydropower construction project. The most important solution to this key issue is to implement the method of working with political leadership and the mass line, to emancipate the minds of survey and design personnel, and to adhere to the principle of “faster, better, and more efficient”. The field, especially the relevant units of the organization and the construction site, are discussed at the site and is a very effective method of work. This article describes some work experience of Wuhan Hydropower Design Institute is worthy of reference.