徐洪河续建一期工程于1991年5月竣工后,经过几个月的紧张准备,二期工程又于9月1日开工了。本期工程包括开挖南自睢宁县沙集,北至浦棠废黄河北岸,全长23.1公里的干河和8.5公里的魏工分洪道,兴建沙集枢纽、废黄河北闸、徐淮、刘圩两座公路桥等,总土方1500多万立方米.全部工程完成后,全长187公里的徐洪河即将全线贯通,不仅可以从根本上缓解全市水源紧缺的状
Xu Honghe continued construction of a project completed in May 1991 after a few months of intense preparation, the second phase started on September 1. This project includes the excavation of Shaji from Suining County in the south, the dry bank of 23.1 km in Puhuang Town to the north and the Wei Gong sub-flood channel in 8.5 km to construct Shaji hub, Huangbei River north gate, Xuhuai and Liu Wei two highway bridges, earthwork total more than 15000000 cubic meters.All the project is completed, a total length of 187 kilometers of Xu Honghe will be fully across the board, not only can fundamentally alleviate the city’s water shortage