利用强夯法处理地基是工程建设中常用方法之一,但对于不同的地质条件和工程要求,其效果会有很大的差异。山东莱城电厂一储灰场坝基属湿陷性黄土,且地下水位较低,采用了强夯法处理,并进行了大量的检测和试验,本文将通过试验对强夯法处理湿陷性黄土地基的效果进行分析,供选择地基处理方法时参考。1 工程概况1.1 地质基本情况 山东莱城电厂储灰场,位于莱城黑山沟,灰场占地约53.4×10~4m~2。该灰场
The use of dynamic compaction method for foundation treatment is one of the commonly used methods in engineering construction, but the effect will be very different for different geological conditions and engineering requirements. The dam foundation of Shandong Laicheng Power Plant’s storage ash yard is a collapsible loess, and the groundwater level is low. It is treated with a strong enthalpy method, and a large number of tests and tests are conducted. This article will deal with the collapsible loess by the strong enthalpy method through experiments. The effect of the foundation is analyzed for reference when selecting the foundation treatment method. 1 Project Overview 1.1 Geological Basic Situation Shandong Laicheng Power Plant ash storage site is located in Laicheng Heishangou, and the ash field covers an area of about 53.4×10~4m~2. The ash field