Experimental p-y curves for liquefied soils from centrifuge tests

来源 :地震工程与工程振动(英文版) | 被引量 : 0次 | 上传用户:qiongxiaobao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The present study aims to obtain p-y curves (Winkler spring properties for lateral pile-soil interaction) for liquefied soil from 12 comprehensive centrifuge test cases where pile groups were embedded in liquefiable soil. The p-y curve for fully liquefied soil is back-calculated from the dynamic centrifuge test data using a numerical procedure from the recorded soil response and strain records from the instrumented pile. The p-y curves were obtained for two ground conditions: (a) lateral spreading of liquefied soil, and (b) liquefied soil in level ground. These ground conditions are simulated in the model by having collapsing and non-collapsing intermittent boundaries, which are modelled as quay walls. The p-y curves back-calculated from the centrifuge tests are compared with representative reduced API p-y curves for liquefied soils (known as p-multiplier). The response of p-y curves at full liquefaction is presented and critical observations of lateral pile-soil interaction are discussed. Based on the results of these model tests, guidance for the construction of p-y curves for use in engineering practice is also provided.
其他文献
基于野外地质调查、变形监测、室内岩土实验及数值模拟等,对广元至巴中高速公路临水寺大桥滑坡地质条件、变形机制及稳定性进行分析.研究结果表明,该滑坡为中型牵引式滑坡,破碎松散岩土体及地形地貌是滑坡的孕灾基础,引发滑坡的主要因素为降雨及工程活动.合理布置监测剖面,监测结果能准确反映滑体内部变形情况,变形量差值拐点为滑面,变形主要集中在暴雨期.降雨作用下滑坡体内渗流场明显变化,孔隙水压力增大,滑带土体强度逐渐削弱.经过抗滑桩和排水沟等措施对滑坡进行综合处治后,通过长期变形监测,坡体深部变形位移收敛,治理效果显著,
夏里2#泥石流沟位于昌都市八宿县夏里乡,根据川藏铁路规划,其线路从夏里2#泥石流堆积扇附近以夏里大桥形式经过.受2013年昌都“8.12”地震影响,夏里2#泥石流沟流域沟谷两侧危岩崩塌普遍发育,存在较丰富崩塌和沟道松散物源,具备暴发较大规模泥石流的可能性,对拟建川藏铁路夏里大桥构成潜在威胁.为掌握泥石流的危害程度,在查明泥石流发育特征基础上,采用CFX软件对夏里2#沟可能暴发泥石流运动过程进行了数值模拟,结果显示100 a一遇泥石流运动堆积至拟建线路附近,且淹没堵塞主河,对拟建大桥桥墩施工及安全运营构成淤
以1986~2019年卫星影像图为依据,分析了南山区填海区的填海历史进程;对收集到的填海区相关地质资料进行整理分析,查明南山区填海区的软土分布并生成了软土等值线图,对填海区地面沉降做出预测计算与分析;从多方面对填海区地面沉降易发程度和危险性进行分析评价,对其进行易发程度分区及危险程度分区,并对各区详细情况进行综述、评价地面沉降的危害程度,最后对填海区地面沉降的发展趋势做出预测预报,为有效的预防和控制地面沉降的产生提供科学依据.
We study the reduction of peak velocity on the ground surface of a soil valley caused by loss of wave energy by large nonlinear strains and strain localization inside the valley, for excitation by a h
随着我国交通量不断增高,部分低等级公路需要改扩建以提升交通运输能力.但是我国西部地区构造活动强烈,地质条件复杂,生态环境脆弱,公路改扩建必将受到环境保护与耕地红线的制约.依托鄂西某改扩建公路实例,在介绍地质背景基础上,通过数值模拟方法研究不同坡率开挖后,边坡的应力应变场特征,研究得出反向结构的岩质高陡边坡,可采用较大坡率开挖,边坡整体稳定性较好,同时减小开挖范围,保护环境的同时节约耕地,降低工程造价.
2018年9月13日贵州省德江县荆角乡小尖山因工程建设诱发大型滑坡地质灾害,9栋房屋倒塌,S303省道严重损毁,滑坡呈现坡缓、顺层、方量大、破坏强等特点.本文以野外滑坡滑动变形特征及过程分析并结合AUI8.5数值模拟方法发现,滑坡整体形态近似长舌状,出露志留系韩家店组厚层状、中厚层状泥岩与薄层状泥质粉砂岩,上覆第四系碎石土,岩体浅层结构松散碎裂,具有贯通地表与滑床的水文地质条件.分析结果表明:地质地貌、岩体破碎、自身重力、持续强降雨和人类工程活动等因素共同作用引发了本次滑坡.持续性降雨是滑坡裂缝形成及扩张
半航空瞬变电磁法(Semi-Airborne Transient Electromagnetic Method)是一种新兴物探方法,可以在地形复杂的区域进行大面积的地毯式勘探,具有良好的发展前景.本文基于半航空瞬变电磁的一维正演理论,对半航空瞬变电磁的实际生产中采集的Ex分量和Vz分量进行了模拟响应分析,指出了Ex分量和Vz分量具有分布简单、均匀的特点.接着对阻尼最小二乘反演算法进行改进,加上正则项约束,降低对模型的依赖,通过改进的阻尼最小二乘约束反演方法进行模拟测算,得出该方法能较为准确的反映出地下电阻
为了更好地解决贵州山区煤矿开采引发地面变形的应急处置问题,通过对某煤矿开采引发地面变形的特征分析,指出了其与普通山体滑坡在运动方式等方面的差异,说明了准确“会诊病因”的重要性,并首次提出了“阻能槽”的概念,且通过稳定性检算论证了“阻能槽”在地面变形应急处置中的有效性,对类似的应急治理工程具有借鉴意义.
在青藏高原东北边缘地带,考古挖掘出的青海喇家遗址史前场景和10 a前我们所目睹过的舟曲特大泥石流,均属于突发性、毁灭性自然灾难事件.从“将今论古”的视角出发,对发生在青藏高原东北边缘古今两次灾害事件的成因机制进行了对比分析.结果认为,相隔近4000 a的这两次毁灭性灾害事件,均是发生在青藏高原东北边缘构造活动带特定地理环境下由量变到质变的结果,在不同空间上相似的悲剧性灾难事件不断地重演,人类在吸取教训上做得不够,对安全隐患的感知是不能遗传的,相比较人的平均寿命来说,当灾害事件所发生的频率较低时,会误以为自
河水-地下水交互带被称为生物过滤器,对氮等污染物有截留净化功能.为研究汉江下游河水-地下水交互带氮的分布特征,本文设立了3个剖面和9口钻井,采集沉积物和地下水样品并进行测试.结果 表明,在样品采集期间交互带剖面1河水补给地下水,剖面2地下水补给河水,剖面3河水和地下水水位持平.交互带地下水pH整体上呈中性,主要水化学类型为HCO3-Ca型,处于缺氧或厌氧的还原环境;地下水硝态氮0.02~0.22 mg/L,亚硝态氮小于0.02 mg/L,小于Ⅰ或Ⅱ类地下水氮的浓度限值;位于农田的1-2井氨氮1.93 mg