Let M be a monoid.Maximal M-Armendariz subrings of upper triangular matrix rings are identified when R is M-Armendariz and reduced.Consequently,new families of
The time for conducting Preventive Maintenance (PM) on an asset is often determined using a predefined alarm limit based on trends of a hazard function. In this