论文部分内容阅读
文章就开发建设项目水工保持环节展开分析,以针对日常水土保持监测工作过程中的麻烦,展开分析,进行良好的施工队伍的建设,积极采取有效的监测方法实现开发建筑项目水土保持过程中各个问题的解决。就目前的施工现状来说,其应用体制是不健全的,无论是开发建设施工体系还是设备、技术应用规模都存在一定的问题,比如施工模式的不切实际性、施工模式的理想化、施工效率的低下,都影响了日常水土保持监测工作的开展。
This article analyzes the construction of hydraulic maintenance links to analyze the troubles in the routine monitoring work of soil and water conservation, analyze the construction of a good team of construction workers, and actively take effective monitoring methods to achieve the development of water and soil conservation project each Problem solving. For the current status of construction, the application system is not perfect, no matter whether it is the development and construction of construction system or equipment, there are certain problems in the scale of technology application, such as impracticality of construction mode, idealization of construction mode, construction Low efficiency, have affected the daily soil and water conservation monitoring carried out.