6000—7000吨重列车的运行组织要解决许多与列车制动装置的准备和运行经路上制动的操纵有关的问题。苏联对这类列车自动制动机的操纵,曾在波里伏日斯克铁路局上进行了运用试验。试验委托给苏联交通部车辆局、机务局、中央铁路运输科学研究院和铁路局的代表按商定的计划在1977年12月进行。试验时挂有途中使用的制动试验车,由2ТЗ10В型内燃机
The operating organization of the 6000-7000-ton train should address many of the problems associated with the preparation of train brakes and the handling of braking on the road. Soviet Union on the operation of automatic train braking of these types of trains, had carried out the operation test on the Pori Fushisk Railway Bureau. The experiment was entrusted to the representatives of the Vehicle Bureau of the Ministry of Transport of the Soviet Union, the Bureau of Machinery and Maintenance, the Central Academy of Railway Science and the Railway Administration in December 1977 in accordance with the agreed plan. Hanging on the road test brake test car used by the 2ТЗ10В type internal combustion engine