丹江口水电站机电设计介绍

来源 :人民长江 | 被引量 : 0次 | 上传用户:huangyl1988
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本电站经综合利用规划及动能经济方案比较(见表1),总装机容量为90万千瓦,考虑远近结合,多年平均发电量为36.4~39.5亿度,选用六台单机容量为15万千瓦的混流式机组,其中两台苏制机组由三门峡水电站调拨,其它四台由东方电机厂设计制造供货。供电范围主要是鄂西北、鄂东及豫西南、豫中地区。输电距离最远约410公里。 The power station through the comprehensive utilization planning and kinetic energy economy program comparison (see Table 1), with a total installed capacity of 900,000 kilowatts, taking into account the distance, the average annual generation capacity of 36.4 to 3.95 billion degrees, the selection of six stand-alone capacity of 150,000 kilowatts Francis mixed flow units, of which two Soviet-made units from Sanmenxia Hydropower Station allocation, the other four from the Dongfang Electrical Factory design and manufacturing supply. Power supply is mainly northwest Hubei, eastern Hubei and Henan Southwest, Henan region. Transmission distance up to about 410 km.
其他文献
以色列的水资源利用率达95%,为了增加可用水量,他研究了一些新型的水资源系统。 1948年以色列国刚建立时,以色列水管理和水研究当局“塔哈尔”(Tahal)的水管理专家们面临的第
一、概述二江泄水闸位于二江中右部及原葛洲坝岛的位置。泄水闸上游引渠及下游尾渠均系人工开挖的导流明渠。整个泄水闸的基础以及导渠渠底为粘土质粉砂质、砂岩与粘土岩互
概述葛洲坝坝址基岩属下白垩纪,地层系砾岩、砂岩、粉砂岩和薄层粘土岩互层。经勘探查明,在第一期工程的基岩中约有60层软弱夹层,按其岩性组合,泥化程度等不同特性,分为五种
前言自古以来,人类就利用岩洞。古时候地下建筑主要用于人类的居住,因为整体岩石为防卸野兽提供条件,并使洞室保持冬暖夏凉。今天,进行地下建筑,人们具有远为优良的机具。实
一、绿水河水电站高压钢管道的外压失稳绿水河水电站的高压钢管道由三段高压平洞和两段斜井组成(见图1),全长约1,300米,最大设计水头为381米(包括15%的动水头),管径为2.8、2
采用真空热蒸镀方法,制备了四种Delta掺杂结构OLED器件,其结构为:ITO/m-MTDATA(50nm)/LiF(xnm)/NPB(10nm)/Alq(5nm)/C545T(0.05nm)/Alq(55nm)/LiF(1nm)/Al,都获得了性能稳定
太湖流域是我国著名的水乡。它北临长江,东滨东海,西与西南以茅山和天目山为界,东南止于杭州湾。在行政区划上,它包括苏南大部、浙江北部和上海市(除崇明县外),总面积约四万
A new ligand 25, 26, 27, 2 8 -tetrakis [2-(o- methoxyphenoxy]ethoxy] calix [4] arene 3 was synthesized by direct base-strength-driven O-alkylation of calix[4]ar
写好英文摘要是论文走向世界极为重要的第一步 ,因此 ,作者应当高度重视。写英文摘要文字力求简洁 ,讲事实 ,不评论 ,要用第三人称方式书写。1 .取消多余的话 ,如文摘开头的
外国文学经典在当今的电影创作中焕发着夺目的光彩。根据外国文学经典改编的电影获得了无数巨大的成功。近年来,对于外国文学经典的电影改编又呈现出了新的态势:即以名作家的