通过对湖南电网负荷及其特性中长期预测和电源结构规划的分析,为满足远景调峰容量的需求,建设抽水蓄能电站已提到议事日程,并介绍了两个规划选点的抽水蓄能电站的基本情况。
Based on the long-term forecast of load and its characteristics in Hunan Power Grid and the analysis of power supply structure planning, in order to meet the demand of long-term peak shaving capacity, the construction of pumped storage power station has been referred to the agenda and the pumped storage of the two planned points The basic situation of the power station.