论文部分内容阅读
本文主要介绍株洲湘江四桥主墩水上基础施工方案的选择,通过具体数据对平台加吊箱的施工方法和围堰施工方法进行比较。
This article mainly introduces the choice of water main foundation construction scheme of Zhuzhou Xiangjiang No.4 Bridge and compares the construction method of the platform with the cofferdam and the cofferdam construction method through the specific data.