Numerical analysis and geophysical monitoring for stability assessment of the Northwest tailings dam

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:csliu08
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The Westwood Mine aims to reuse the tailings storage facility #1(TSF #1) for solid waste storage, but,downstream of the Northwest dike is considered critical in terms of stability. This paper uses numerical modeling along with geophysical monitoring for assessing the Northwest dike stability during the restoration phase. The impact of waste rock deposition in the upstream TSF #1 is considered. The geophysical monitoring is based on electrical resistivity methods and was used to investigate the internal structure of the dike embankment in different deposition stages. The numerical simulations were performed with SLOPE/W code. The results show a factor of safety well above the minimum recommended value of 1.5. Geophysical monitoring revealed a vertical variation in the electrical resistivity across the dike, which indicates a multilayer structure of the embankment. Without any current in situ data, the geophysical monitoring helped estimating the nature of the materials used and the internal structure of the embankment. These interpretations were validated by geological observation of geotechnical log of the embankment. Based on this study, it is recommended that the water polishing pond be partly filled before waste rock is deposited in TSF #1. In addition, to ensure the stability of the dike, the piezometric head monitoring prior to and during waste rock deposition is recommended. The Westwood Mine aims to reuse the tailings storage facility # 1 (TSF # 1) for solid waste storage, but, downstream of the Northwest dike is considered critical in terms of stability. This paper uses numerical modeling along with geophysical monitoring for assessing the Northwest The impact of waste rock deposition in the upstream TSF # 1 is considered. The geophysical monitoring is based on electrical resistivity methods and was used to investigate the internal structure of the dike embankment in different deposition stages. The numerical The results show a factor of safety well above the minimum recommended value of 1.5. Geophysical monitoring revealed a vertical variation in the electrical resistivity across the dike, which indicates a multilayer structure of the embankment. Without any current in situ data, the geophysical monitoring helps provided the nature of the materials used and the inte rnal structure of the embankment. These interpretations were validated by geological observation of geotechnical log of the embankment. Based on this study, it is recommended that the water polishing pond is partly partly filled before the waste rock is deposited in TSF # 1. ensure the stability of the dike, the piezometric head monitoring prior to and during waste rock deposition is recommended.
其他文献
期刊
There are millimeter, micron and nanometer scales of pores and fractures in coal to describe different scales of coal pores and fissures communicating path and
期刊
从东部沿海到西部大地,随处可见新型幕墙装点着现代化建筑,从北京奥运会到上海世博会,各式各样的幕墙建筑见证了这个行业的蓬勃发展。随着新科技的发展,建筑幕墙正向高性能、保温
Nanomesh graphene(NMG) obtained by template chemical vapor deposition was used to synthesize the binder-free graphene monoliths by simple tablet pressing.The st
期刊
数学教育中教师扮演着多种角色,从多方面影响着学生的发展.课程改革是素质教育工程中的核心,教师的教育观念决定着教学行为,新课程下的教育观念要求教师树立“育人为本”的教
对于浙江省诸暨市的救灾工作来说,2011年“6·16”洪灾减灾救灾经验值得好好总结.在此基础上不断探索防灾、减灾、救灾的新途径,进一步完善自然灾害救助体系,将诸暨市的防灾
一、鲅鱼圈保利大剧院装饰工程简介  鲅鱼圈保利大剧院,坐落于鲅鱼圈南部新城区黄金地段,建筑面积约3万平方米,是鲅鱼圈金泰文化艺术广场的核心组成部分。该剧院将满足大型歌
目的 探讨4-羟苯基维胺脂(4-HPR)对HeLa细胞生长抑制和凋亡的影响,研究小剂量4-HPR对HeLa细胞的放射增敏效应。方法 用四甲基偶氮唑蓝比色法(MTT)观察4-HPR对HeLa细胞的生长抑
油气集输系统在生产的过程中存在很多安全隐患问题,如果不能采取有效的措施加以防范,不仅会对安全生产带来影响,还会为企业带有一定的经济损失,对企业的发展带来严重影响.企
期刊