论文部分内容阅读
交通部工程管理司于1991年9月20日至23日在河北省涿州市主持召开了高速公路分期修建及交通工程设施分期实施座谈会,全国23个省、市交通主管部门和设计单位以及部属科研、设计单位的有关领导和专家70余人出席了会议。河北省交通厅邓昌瑞厅长,何少存、李更申副厅长也参加了会议。会议期间,与会同志还参观了京石高速公路保定至石家庄段已建成的半幅高速公路分别划有双车道和三车道线的试验段。与会同志就我国高速公路的分期修建(主要是横向分期修建)和交通工程设施分期实施问题展开了认真热烈地讨论,互相交流经验并进行了探讨,就一些认识问题和技术问题取得了基本一致的意见。这些意见对当前我国高速公路建设具有指导意义,本刊特全文转载。
Ministry of Communications Engineering Management Division in September 20, 1991 to September 23 in Zhuozhou City, Hebei Province, hosted a highway construction and installment of the implementation of transport engineering stages of the implementation of the country’s 23 provinces and municipalities, transportation authorities and design units and subordinates More than 70 leaders and experts from scientific research and design institutes attended the conference. Tang Changrui, director of Hebei Provincial Communications Department, He Shaocun and Li Gengshen, deputy director also attended the meeting. During the meeting, the comrades also visited the trial section of the half-expressway with two-lane and three-lane lines respectively built in the Baoding-Shijiazhuang section of the Beijing-Shijiazhuang Expressway. The comrades held a serious and enthusiastic discussion on the phases of the construction of the expressway in our country (mainly the construction of horizontal installments) and the implementation of the traffic engineering facilities, exchanging experiences and discussing each other, and basically getting the same understanding on some problems of understanding and technology opinion. These opinions on the current construction of our country highway has guiding significance, this article special full text reproduced.