Development of Precise Geoid Model for the Establishment of Consistent Height System in Geoga Grand

来源 :中国海洋工程(英文版) | 被引量 : 0次 | 上传用户:hf2562
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The national benchmarks on islands were mostly established by trigonometric leveling in Korea. This method results in inaccuracy, which is a serious problem in Geoga Grand Bridge construction work that tried to link the mainland and the islands. The Geoga Grand Bridge (Pusan-Geoje fixed link project) was selected as the study area, a huge construction work in Korea that will connect the mainland (Pusan) and an island (Geoje island). However, the orthometric heights issued at benchmarks (JINH and GOEJ) were not consistent, because they did not refer to the same zero point, which would make the linking of the sections problematic. This paper introduces the precise local geoid as a vertical datum for the construction area in order to establish a consistent height system. To determine the precise local geoid for the construction area, we firstly developed a precise gravimetric geoid for Korea and its adjoining seas as a whole. This gravimetric geoid was developed by use of all available gravity data, including surface and satellite data on land and on the ocean. The gravimetric geoid was computed by spherical fast fourier transform with modified Stokes' kernels. The remove-restore technique was used to eliminate the terrain effects by use of the RTM reduction and to determine the residual geoid by combining the GGM02S/EGM96 geopotential model, free-air gravity anomalies and high-resolution DEM data. Finally, the gravimetric model was fitted to the geoid heights obtained from GPS and tide observations (N_(GPS/Tide)) by least square collocation, to provide the final GPS-consistent local precise geoid model. The post-fit error (std. dev.) of the final geoid to the N_(GPS/Tide) derived from GPS and tide observations was ±2.2 cm for the construction area. We solved the height inconsistency problem by calculating the orthometric height of the benchmarks and the control points using the final geoid model. Also, the highly accurate orthometric height was estimated through the GPS/leveling technique by applying the developed local precise geoid. Therefore, the precise local geoid is expected to improve the quality of the construction procedure of the Geoga Grand Bridge.
其他文献
现有法律否定了行政诉讼调解,但这一规定存在理论缺陷,设置行政诉讼调解制度具有其必要性和可行性,亟待推行.
Absorption spectra of the mixed chain nickelates (NdxY1–x)2BaNiO5 were measured for different x. Experimentally two evidences for the presence of non-equivalen
The vortex-induced vibrations (V/V) of barrel-shaped mast are calculated by three numerical methods, i.e. New-mark-β, HPD-L (High Precision Direct integration
Suction caissons have been widely used as anchors and foundations for floating and fixed offshore platforms.The pull-out performance of conventional suction cai
个人信用贷款业务由于其自身的特点,决定商业银行必须从内部加强风险控制体系中与个人信用贷款业务相应的部分,通过强化风险控制部门的职能及人员配备、增加流程中风险控制点
The experimental monoclinic CF parameter (CFP) sets obtained by Duan et al.(Phys.Rev.B 75 (2007) 195130) forEr3+ and Nd3+ ions in YAIO3 were reanalyzed.These CF
三鹿毒奶粉事件、国产手机收费陷阱事件、松花江水污染事件等的接连曝光暴露出目前我国公民维权面临的投诉无门、有求无应的窘境,也证明了我国公益诉讼制度缺失所带来的严重
At present, more and more offshore wind farms have been built and numerous projects are on the drawing tables. Therefore, the study on the safety of collision b
This study examines the performance of an air expansion oil fence system as deployed in two different configurations.Geometric and tension characteristics of th
水库运行期水位每年周期性涨落,岸坡土体在库水循环加卸载作用下会发生不同程度的阶梯状变形。为探求循环加卸载对岸坡深部变形的诱发机理,本文以水库防洪限制水位以下岸坡土体