论文部分内容阅读
党的十五届五中全会提出“十五”计划的建议,在电力建设中要求调整电源结构,发展水电、坑口大机组火电,压缩小火电,适度发展核电,发展新能源和可再生能源,这是十分正确的。国内电站设计、建设、运行和设备制造、安装等单位已经具有相当强的实力,应主要依靠自己的力量实现调整电源结构的任务。现对国内的发电设备制造工业现状进行分析,并提出建议:国内设计制造水力发电设备已有50年的历史,近20余年自行设计制造了长江葛洲坝、广西岩滩、青海龙羊峡等水电站及引进关键技术或与国外合作制造了青海李家峡、福建水口、云南鲁布格、湖南五强溪、凌津滩、四川二滩等水电站安装的大型转浆式、混流式和贯流式水电机组,虽然个别发生局部振动等问题,但都在正常运行,产生着巨
The Fifth Plenary Session of the 15th CPC Central Committee put forward the proposal of “the Tenth Five-Year Plan”, calling for the adjustment of the power supply structure in power construction and the development of hydropower, power generation of large units at Hang Hau, compression of small thermal power, appropriate development of nuclear power, development of new energy sources and renewable Energy, this is very correct. Domestic power station design, construction, operation and equipment manufacturing, installation and other units already have considerable strength, we should rely mainly on their own power to achieve the task of adjusting the power structure. At present, we analyze the status quo of power generation equipment manufacturing industry in our country and put forward suggestions: Hydropower equipment has been designed and manufactured in China for 50 years. In the past 20 years, Gezhouba, Guangxi Yantan, Longyangxia, The introduction of key technologies or cooperation with foreign countries to create a large slurry-mixing, Francis and tubular turbine units installed in hydropower stations such as Lijiaxia in Qinghai Province, Shuikou in Fujian Province, Yunnan Rubuge, Hunan Wuqiangxi, Lingjin Beach and Sichuan Ertan, Although some local vibration and other issues, but are in normal operation, resulting in huge