控制工程造价就是在保证工期和质量满足要求的情况下,采取相应的管理措施,把成本控制在计划范围内,并进一步寻求最大程度的成本节约。我国现行工程造价的构成主要划分为设备及工器具购置费用、建筑安装工程费用、工程建设其他费用、预备费、建设期贷款利息、固定资产投资方向调节税等几项构成。
Control project cost is to ensure that the duration and quality to meet the requirements of the circumstances, to take appropriate management measures to control the cost within the scope of the plan, and to further seek maximum cost savings. The composition of the current project cost in our country is mainly divided into several components, such as the purchase cost of equipment and industrial equipment, construction and installation costs, other expenses for construction projects, prepaid expenses, loan interest during the construction period and the regulatory tax on the investment of fixed assets.