公路工程《路基土石方工程数量计量程序》的开发及应用

来源 :河南交通科技 | 被引量 : 0次 | 上传用户:yjq360124
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文介绍了公路工程《路基土石方工程数量计量程序》在国道310线开封—洛阳高速公路及国道107线郑州—新郑段高速公路建设中的开发与应用,并详细地介绍了程序构思及技术要点、性能、特点及具体运行环境,说明了操作步骤。经过一年多使用,得到用户的好评,认为本程序可在公路、铁路工程土石方工程数量计算中推广应用。 This paper introduces the development and application of highway project “Subgrade Earthwork Counting Procedure” at Kaifeng State Highway 310 - Luoyang Expressway and State Highway 107 Zhengzhou - Xinzheng expressway construction, and introduces in detail the program concept and technical points, Performance, characteristics and specific operating environment, describes the steps. After more than a year to use, users get the praise, that this program can be highway, railway engineering in the calculation of the number of earth and stone popularization and application.
其他文献
长期以来,健康专家一直警告人们肥胖的危险,但日本一项最新研究表明,过于消瘦的人面临的健康风险更大,略微丰满的人最为长寿。日本东北大学医学研究生院的研究人员在日本宫城
本文给出用串行流水线方式实现低阶快速付立叶变换及用组合的方式实现高阶或二维快速付立叶变换的方法。本文所分析的变换方法具有变换速度快、实现方便、节省硬件等特点,而
  Fusarium oxysporum f.sp.cucumerinum was isolated from infected cucumber seedlings and mature plants from different parts of India.These isolates have been c
会议
  Due to its long longitudinal distance, Japan embraces a wide diversity of organisms.In spite of a relatively long history of mycobiota inventories in Japan,
会议
  Colletotrichum includes a number of pathogens of major importance, causing diseases of a wide variety of hosts.Rapid and reliable identification of pathogen
会议
我所几年来栽培无籽西瓜逐步摸索了一些技术经验,取得了稳产高产的成绩。1975年,我们用营养钵育苗培育的无籽西瓜,亩产7,859.8斤,平均单瓜重10斤以上,最大的瓜重14斤,含糖10%
  Vascular wilt caused by Fusarium oxysporum is one of the most important diseases in Jiroft and Kahnuj region in south part of Iran.Forty two isolates of Fus
会议
  The traditional application of plant pathogenic fungal names in Australasia has been based on European and North American taxonomic systems.This approach wa
会议
  Fungi are the secondary largest organism on earth and the numbers of fungal species have been estimated to be 1,500,000, 616,320 ± 308,100 and 5,100,000 by
会议
7.5 系统的调试 7.5.1 调试步骤系统进入全面调试之前,必须做好下列准备工作,以达事半功倍的效果。 1.在安装系统各部件之前,要事先检查电缆的通路、短路及绝缘情况,这可以