奉贤换流站直流800 kV穿墙套管的安装工艺

来源 :电力建设 | 被引量 : 0次 | 上传用户:conanjunn
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对向家坝—上海±800 kV特高压直流示范工程奉贤换流站工程中直流800 kV穿墙套管的安装,提出了一套细致的施工方案。在施工中探索总结出一套可靠、实用的大型直流穿墙套管安装工艺,通过悬挂配重平衡、转移重心、内外配合等方法,保证了套管安装工作全过程在安全、可控的情况下进行,为同类型穿墙套管安装提供参考和借鉴。
其他文献
本文通过对荣华二采区10
To solve the problem of data recovery on free disk sectors,an approach of data recovering based on intelligent pattern matching is proposed in this paper.Differ
Time-"frequency rate" distribution(TFRD)is an extension of the traditional time-frequency distribution(TFD),and it exploits the relationship between time and fr
A 3D continuous autonomous chaotic system is reported, which contains a cubic term and six system parameters. Basic dynamic properties of the new Van der Pol Je
A practical suspen-dome project, Changzhou Gym roof, is adopted as an example and its transient analysis based on the multi-support excitations of the earthquak
To apply the multi-point forming technology to the field of tube processing,the process of multi-point forming for tube is studied.Numerical simulation for the
Privilege user is needed to manage the commercial transactions,but a super-administrator may have monopolize power and cause serious security problem.Relied on
To improve the reliability and accuracy of visual tracker,a robust visual tracking algorithm based on multi-cues fusion under Bayesian framework is proposed.The
Although FireWire-based memory acquisition method has been introduced for several years,the methodologies are not discussed in detail and still lack of practica
本文通过对荣华二采区10