英国核工业的危机

来源 :世界研究与开发报导 | 被引量 : 0次 | 上传用户:guobinlei
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着核能成本以及淘汰过时核电站的成本不断上升,英国核工业的危机也在日益的加深。在赛兹维尔建造的英国第一台压水堆的发电成本现在估计为每度8到10便士,而燃煤电厂的发电成本却只有每度3便士。关闭一个核电站所需的估计成本也大大增加——从30亿英镑上升到150英镑。据估计,单单淘汰马格罗克斯核电站的八个反应堆,便需付出66亿英镑的费用。 With the rising cost of nuclear energy and the ever-increasing cost of obsolete nuclear power plants, the crisis in the British nuclear industry is also increasing. The cost of power generation for the UK’s first pressurized water reactor, built in Sethville, is now estimated at 8 to 10 pence per degree, while the cost of generating electricity from coal-fired power plants is only 3 pence per degree. The estimated cost of shutting down a nuclear power plant has also greatly increased - from 3 billion pounds to 150 pounds. It is estimated that the cost of 6.6 billion pounds will be charged for the elimination of the eight reactors in the Magloques.
其他文献
【法国《能源快报》1990年9月4日报道】发展中国家的核动力占世界核电装机容量的7%左右。1988年初,亚洲、拉丁美洲和地中海地区的7个发展中国家拥有的运行核动力机组为24套
上海汽车制造厂喷涂 PVC 涂料流水线,一直使用从美国格雷利公司进口的喷涂机(美国该公司的喷涂设备是世界上的王牌)。几个多月前,不料这条流水线上的美国喷涂机突然坏了,又
【西德《原子经济新闻》1990年2月号报道】苏联核能核工业部已委托西门子公司发电部计算苏联正在建造中的核电厂防震安全性。苏联在设计反应堆大厅和反应堆方面的方法,将与
全国第四次优秀工程设计、第二次工程勘察的评选工作已经结束,经全国优秀工程勘察设计评选委员会终评,共评出优秀设计金质奖35项、银质奖69项、铜质奖44项,优秀工程勘察金质
【美国《核子周刊》1990年3月29日刊第7页报道】一个由民德和西德核管理机构指定的工作组自本周起就1991年前两德的核法律的统一问题开始进行讨论。有关人士说,德国统一步伐
北京国际会议大厦位于北郊亚运村。总建筑面积4.6万M~2。是举办各种规模的国内外会议和展览的理想场所。内设可容纳3000人的大会议厅及容纳700人的中会议厅,以及规格齐全的
唐山市针对老企业多、设备陈旧、技术落后的状况,从1984年开始,有领导、有计划、有步骤地对企业进行了大规模的技术改造。到去年底为止,共完成技改项目690个,主要行业的骨干
机电工业部“七·五”科技攻关项目,G20、G30系列高压齿轮泵于1989年12月25日至26日在四川省泸州市通过部级技术鉴定。该泵系长江液压件厂引进美国Vickers公司技术,具有国际
日本的电气与电子厂商差不多是在两年前就已开始把他们的生产或组装工厂从南朝鲜和台湾向东南亚国家转移。现在,世界上的元部件厂商正在马来西亚、泰国和新加坡进行大量投资
近日,北京颖泰嘉和生物科技股份有限公司和江西禾益化工有限公司就富美实公司向美国国际贸易委员会提出申请,指控美国进口以及美国国内市场销售的甲磺草胺、甲磺草胺组合物以