深圳市罗湖商业城工程成功的利用及改造废旧基础,取得很好的经济效益,节约工程费用约350万元,缩短工期约三个月。 一、概述: 随着高层建筑的高速发展,人们对高层建筑的使用功能、平面布置、立面要求日新月异,特别是变更开发商思路更是常见。很多已完成基础施工的工程也全面返工,报废的基础工程及返工凿除报废基础的费用约占工程总投资百分之十,造成很大浪费,同时也影响工期数月。深圳这样的工程例子可以举出不少。
The Luohu Commercial City Project of Shenzhen City successfully used and reconstructed the waste foundation, and achieved very good economic benefits. It saved engineering costs by about 3.5 million yuan and shortened the construction period by about three months. I. Overview: With the rapid development of high-rise buildings, people’s requirements for the use of high-rise buildings, layout, and facades are changing with each passing day. It is even more common for developers to change their thinking. Many of the projects that have completed the basic construction have also been completely reworked. The cost of retiring basic projects and reworking the scrapped basis accounts for about 10% of the total project investment, resulting in great waste and affecting the duration of the project for several months. Examples of projects like Shenzhen can be cited.