武汉绿地中心项目高度为636米是世界在建第三高楼,项目施工已出正负零,主楼结构进入快速施工阶段,BIM技术在武汉绿地中心项目应用已经全面展开,本文主要介绍BIM技术在指导顶升钢平台模架安装,解决了垂直运输与材料周转、管线优化、顶模与钢结构吊装碰撞检查等问题,最终使自带塔机顶升模架平台安装顺利完成,保证了武汉绿地中心项目主楼地上核心筒结构施工进度以及其顺利进行。
Wuhan Green Center project height of 636 meters is the world’s tallest building under construction, the project construction has a positive and negative zero, the main building structure into the rapid construction phase, BIM technology in Wuhan Green Center project has been fully launched, this paper introduces BIM technology in the guidance Top steel platform formwork installation, to solve the vertical transport and material turnover, pipeline optimization, top mold and steel structure hoisting collision check and other issues, and ultimately make their own Tower crane rose platform formwork platform successfully completed to ensure Wuhan Green Center The construction progress of the ground core structure of the main building of the project and its smooth progress.