论文部分内容阅读
承建单位:山西省工业设备安装集团有限公司参建单位:山西一建集团有限公司、山西二建集团有限公司、山西建筑工程(集团)总公司开工日期:2010年6月15日竣工日期:2013年7月15日一、工程概况临汾新医院室内安装工程位于山西省临汾市新城区,项目占地面积23.4万m~2,建筑总规模149610m~2,框剪结构,建筑高度43.5m,地下一层,地上十层,裙楼地上三层,是一座集医疗、急救、教学、科研、保健、康复为一体的现代化、信息化、智能化的大型三级甲等医院,共设
Construction unit: Shanxi Industrial Equipment Installation Group Co., Ltd. Participated units: Shanxi Yi Jian Group Co., Ltd., Shanxi II Construction Group Co., Ltd., Shanxi Construction Engineering (Group) Corporation Date of construction: June 15, 2010 Completion date: 2013 July 15, 2015 I. Project Overview The indoor installation of Linfen New Hospital is located in Xincheng District, Linfen City, Shanxi Province. The project covers an area of 234,000 m 2, with a total building size of 149610m 2, frame-cut structure and building height of 43.5m, The first floor, the ground floor, three podium floor, is a set of medical, first aid, teaching, scientific research, health care, rehabilitation as one of the modern, information, intelligent large-scale first-class hospitals, a total of