针对尧柳水库工程建设会引起枢纽工程区、供水管线区、弃渣场区、料场区等区域发生较为严重的水土流失,生态环境恶化等问题,结合工程特性和现有资源条件,依据产业政策、行业规划、技术标准等相关规定,建立符合工程实际的水土流失防治重点和措施布局方案。通过工程措施、植物措施和临时措施等相结合的综合水土流失防护治理,可有效改善项目区的生态环境,增强边坡稳定,减轻水土流失,保护土地资源。
In view of the problems such as soil erosion and deterioration of ecological environment in the project area, water supply pipeline area, waste slag yard area and yard area caused by the construction of Yaoliu Reservoir project, combined with the engineering characteristics and existing resource conditions, Policies, industry plans, technical standards and other relevant provisions, the establishment of projects in line with the actual control of soil erosion prevention and control measures and layout plan. Through integrated measures of soil and water conservation, such as engineering measures, plant measures and temporary measures, the project can effectively improve the ecological environment of the project area, enhance slope stability, reduce soil erosion and protect land resources.