安装与土建施工的协调配合管理要点

来源 :城市建设理论研究(电子版) | 被引量 : 0次 | 上传用户:slippers3000
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着建筑单位对建筑工程建设成本控制的加强和工期的追求,现代建设工程项目的集成化管理的趋势越来越明显。在集成化管理当中对于工程安装与土建工程的协调管理,以保证工程建设的顺利开展是集成化管理的难点。本文详细论述安装与土建施工的协调配合管理要点,以期能够对当前的安装与土建工程施工带来一些启示和帮助。
其他文献
Steel matrix composite coatings locally reinforced with in situ TiC-TiB2 particulates were prepared by argon arc cladding(AAC) with different mass fractions of
Counter gravity casting equipments(CGCE) were widely used to produce large thin-walled A357 aluminum alloy components. To improve the pressure control precision
BaCe0.45Zr0.45M0.1O3-δ (M=Y, In) and BaCe0.9Y0.1O3-δ were prepared through the conventional solid state reaction route. The chemical stability was investigate
Ordered Ni70Fe30 nanowire array was fabricated in a porous alumina template by altemating current electrodeDositiOn.The structural and magnetic properties of th
We propose the spectrum allocation and resource scheduling algorithms in cognitive point to multipoint (PMP)networks with rapid changes of spectrum opportunitie
The structure and electrical properties of(Na0.5Bi0.5)0.94Ba0.06TiO3 ceramic doped with 0.5 wt% of MnO were investigated in comparison with those of(Na0.5Bi0.5)
Reduction of Bama ilmenite concentrate containing 49.78% TiO2 and 27.96% total Fe by graphite was studied using thermogravimetric analysis system under argon ga
Asymmetric rolling(ASR), as one of severe plastic deformation(SPD) methods, was widely used to make ultra-fined materials with enhanced performance. Internal ma
In this review, the progress made during the last two years with respect to the syntheses and novel properties of one-dimensional (1D) ZnS nanostructures is pre
Nucleation and growth model based on Cellular Automation(CA) incorporated with macro heat transfer calculation was presented to simulate the microstructure of a