三峡工程论证专家组根据三峡工程领导小组关于进一步研究三峡工程统一的综合性替代方案意见,由地质地震、枢纽建筑物、航运、电力系统、水库移民、综合规划与水工、施工、投资估算等专题论证专家组的主要负责人和专家,以及其他有关单位组或的查勘团于1988年6月61日至18日对金沙江溪落渡和向家坝两工程进行了查勘。查勘团成员听取了我院关于溪落波水电站和中南院关于向家坝水电站情况的汇报,并通过现场查勘,加深了对这两个工程的
Three Gorges Project Demonstration Expert Group According to the Opinions of the Leading Group of Three Gorges Project on further studying the unified alternative plan of the Three Gorges Project, the experts from the Three Gorges Project Demonstration Group are composed of geological seism, hub buildings, shipping, power system, reservoir resettlement, integrated planning and hydropower, construction and investment estimation Key investigators and experts from the expert group of the thematic demonstration and teams from other relevant units conducted a survey of the two projects of Crossing and Xiangjiaba of the Jinsha River from June 61 to June 18, 1988. The members of the investigation team listened to our reports on the situation of Xiacheng Hydropower Station and Zhongnan Hospital about Xiangjiaba Hydropower Station in our hospital and deepened the investigation on these two projects