【摘 要】
:
京杭运河苏北段南起扬州六圩口,北至徐州蔺家坝,全长 404公里,通过国家两次大规模整治,渠化成 10个梯级,整治成二级航道,每个梯级都建有复线船闸 (解台复线船闸在建 ),最大水位总
论文部分内容阅读
京杭运河苏北段南起扬州六圩口,北至徐州蔺家坝,全长 404公里,通过国家两次大规模整治,渠化成 10个梯级,整治成二级航道,每个梯级都建有复线船闸 (解台复线船闸在建 ),最大水位总落差达 33. 1米,已通航的 19座船闸年通过量 1999年已达 67561万吨,部分繁忙双线船闸
The north section of the Beijing-Hangzhou Grand Canal runs six levees from the Yangzhou to the south and to Linjiaba in the north to Xuzhou. It has a total length of 404 kilometers. Through two large-scale national remediation projects, the canal has become 10 steps and rectified into two courses. Each step is built Double-line shiplock (Xie Taiwan double-line ship lock under construction), the maximum drop of 33 total water level. 1 meter, 19 shiplocks that have been navigable The annual throughput in 1999 reached 675.61 million tons, part of the busy two-lane ship lock
其他文献
本文首先对石油管道企业仪表自动化设备的故障预防措施进行了分析,进而对仪表自动化设备的故障维护工作进行了研究,旨在说明加强仪表自动化设备的故障预防和维护的重要性,为
在小电流接地系统申,当中性点不接地或经消弧线圈接地的电力系统发生单相接地故障时,会发出接地信号。但有时由于电压互感器高压熔断器熔断、谐振过电压、断相、负载严重不平街
以烟气连续排放监测系统在焦作电厂燃煤发电机组上的应用为例,介绍了一种加热式直接抽取法烟气连续监测系统的原理,分析了系统组成及功能、系统运行及系统的维护检修.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
“人生在世,短短几十年,应像蜡烛一样,从顶燃到底,永远发出光明.”rn祝荣水一直坚守着一个信念:人生在世,短短几十年,应像蜡烛一样,从顶燃到底,永远发出光明.如果一生碌碌无
为保证电能供应的稳定性、安全性,要注重配电运检管理工作.基于此,本文分析了配电线路常见故障,如单相接地故障、变压器故障、短路故障等,并提出了配电运检管理措施,如运检管
2008年是中国改革开放30周年.从最早的4个经济特区,到14个沿岸开放城市,从省会,沿海、沿江城市,再到加入WTO,从点、线、面再到全局性开放,中国的经济在30年中取得了令人瞩目
天然气在长输过程中会出现水和杂质,为确保管输天然气的气质,输气干线每隔一定距离,会设置输气站,对天然气长输过程中出现的水和杂质进行处理.通过汇集、分离、除尘等功能,把
采用摩擦搅拌工艺制备Al/Al2Cu原位纳米复合材料,研究摩擦搅拌工艺参数如旋转速率、行进速率、搅拌道次和搅拌针形状对铝基纳米复合材料显微组织、化学反应和显微硬度的影响.