论文部分内容阅读
基本建设项目竣工图(以下简称竣工图)是各种地下、地上建筑物、构筑物经施工后最终形成的技术文件,是对工程进行交工验收、维护、改建、扩建的依据,是基本建设项目竣工档案的核心部分之一。因此竣工图编制必须真实、准确地反映项目竣工时的实际情况,做到图物相符、技术数据可靠、签证手续完备以及整理符合档案管理要求。笔者一直从事基本建设项目工程的档案
The completion drawing of the capital construction project (hereinafter referred to as the “completion drawing”) is a technical document finally formed after the construction of various underground and aboveground buildings and structures. It is the basis for acceptance inspection, maintenance, alteration and expansion of the project. It is the completion of the capital construction project One of the core parts of the file. Therefore, the compilation of the completion plans must reflect the actual conditions at the completion of the project in a true and accurate manner, so as to make the maps consistent, the technical data reliable, the visa formalities complete and the compilation in conformity with the requirements of the archives management. I have been engaged in capital construction project archives