论文部分内容阅读
辽宁关门山水库混凝土面板堆石坝是我国修建的第一批面板坝之一,也是最早完成的,其原型观测成果一向为国内同行所关心。关门山坝最大坝高58.5m,1986年6月开始填筑,1987年底基本填完堆石体,1988年4月下旬浇筑混凝土面板,6月基本浇完,9月下旬落闸蓄水。目前最高库水位357.8m,其水深为正常水深的70%,运行情况良好。据辽宁水利电力厅《水利简报》报道截至1990年1月,原型观测初步成果如下:
Liaoning Guanmen Reservoir Concrete Faced Rockfill Dam is one of the first panel dam built in our country. It is also the earliest completed, and its prototype observation results have always been concerned by domestic counterparts. The closure of dam dam dam height of 58.5m, began in June 1986 filling, by the end of 1987 the basic filling of rockfill body, in late April 1988 pouring concrete panels, basically poured in June, late September sluice storage. At present, the highest reservoir level 357.8m, the water depth of 70% of normal depth, operating in good condition. According to the Liaoning Provincial Water Power Authority, “Water Briefing” reported as of January 1990, the preliminary results of prototype observations are as follows: