船舶艉柱轴毂孔的镗削是轴系安装过程中的一道重要的工序,其质量直接影响到后续工序的进行和轴系的工作性能。目前,艉柱轴毂孔都是用镗孔机在船台上就地镗削的。极易出现较大的同轴度误差,给艉管的安装带来很大的困难。对有艉管的结构,部标准规定同轴度误差为0.10毫米,国外对无独立艉管的结构同轴度误差要求为0.02毫米/米。为了达到加工的要求,减少同轴度误差,目前工厂都是在镗杆中间再设一支承,以提高镗杆的刚性,减小其挠度。
The boring of the shaft of the ship pillars is an important process during the installation of the shaft system. The quality of the shaft directly affects the operation of the subsequent processes and the working performance of the shaft system. At present, the stud shaft hub holes are boring boring machine on-site boring. It is easy to appear the greater coaxiality error, which brings great difficulties to the installation of the pipe. For the pipe structure, the Ministry of Standards requires that the concentricity error is 0.10 mm. The concentricity error of foreign pipe without independent pipe is required to be 0.02 mm / m. In order to meet the machining requirements and reduce the error of coaxiality, at present, the factory has set up a bearing in the middle of the boring bar to increase the rigidity of the boring bar and reduce its deflection.