论文部分内容阅读
一、概述龙羊峡水电站的安装间,位于坝址区左岸,采用地下窑洞式布置型式,其轴线距左坝肩约100米,基本为坝后洞室。与地下安装间相关联的辅助洞室尚有进厂交通洞、主变压器运输洞及施工期使用的各种出渣洞、临时交通
I. Overview The installation of Longyangxia Hydropower Station is located on the left bank of the dam site. It adopts underground cave-hole layout type. Its axis is about 100 meters away from the left abutment of the dam and basically is the post-dam cavern. Auxiliary caverns associated with underground installations still have access to the factory traffic tunnel, the main transformer transport holes and the construction of the use of a variety of dregs, temporary traffic