Steam Flooding after Steam Soak in Heavy Oil Reservoirs through Extended-reach Horizontal Wells

来源 :Petroleum Science | 被引量 : 0次 | 上传用户:zhou20p
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs. It is possible to set special packers within the long completion horizontal interval to establish an injection zone and a production zone. This method can also be used in steam flooding after steam soak through a horizontal well. Simulation results showed that it was desirable to start steam flooding after six steam soaking cycles and at this time the oil/steam ratio was 0.25 and oil recovery efficiency was 23.48%. Steam flooding performance was affected by separation interval and steam injection rate. Reservoir numerical simulation indicated that maximum oil recovery would be achieved at a separation section of 40-50 m at steam injection rate of 100-180 t/d; and the larger the steam injection rate, the greater the water cut and pressure difference between injection zone and production zone. A steam injection rate of 120 t/d was suitable for steam flooding under practical injection-production conditions. All the results could be useful for the guidance of steam flooding projects. This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs. It is possible to set special packers within the long completion horizontal interval to establish an injection zone and a production zone. This method can also be used in steam flooding after steam soak through a horizontal well. %. Steam flooding performance was affected by separation interval and steam injection rate. Reservoir numerical simulation indicated that maximum oil recovery would be achieved at a separation section of 40-50 m at steam injection rate of 100-180 t / d; and the larger the steam injection rate, the greater the water cut and pressure difference between injection zone and production zone. A steam injec tion rate of 120 t / d was suitable for steam flooding under practical injection-production conditions. All the results could be useful for the guidance of steam flooding projects.
其他文献
PP40描绘器与 80C552单片机接口 ,可以构成带有实时打印输出的高性能的智能仪器或便携式仪表 ,也可构成带实时就地打印输出的控制系统。文中介绍了 80C552单片机与PP40描绘器
2004年12月26日早上8时,印度尼西亚苏门答腊岛北部发生强烈地震,由此引发的大海啸席卷了印度洋周边的一些国家,突如其来的灾难,致使约20万生命瞬间即失。全世界都向海啸受灾
鸡西矿业集团公司张辰煤矿西三采区3
期刊
日本电电公司的电气通信研究所采用长波长波段的半导体激光器和单模光纤,对传输容量800兆位/秒信号的无中断光传输实验已获成功。其光源为 InGaAsP/InP 半导体激光器,在室温
理化分析学组工作会议于83年3月26日至30日在北京召开。学组正副组长单位及特邀单位共15个厂所22名代表参加了会议。会议听取了五个地区学组开展活动的情况汇报,讨论确定了
北京时间2008年2月17日凌晨,在刚刚结束的第58届柏林电影节颁奖典礼上,唯一一部入围的中国内地影片《左右》获得最佳编剧银熊奖,导演兼编剧王小帅领取了奖杯。之前,该片已 B
近年来的研究发现小儿对疼痛可产生明显的应激反应,这些反应可被完善的麻醉镇痛方法减轻,因此对小儿疼痛必须和成人同样进行治疗[1].阿片类药物是临床常用的镇痛药,镇痛作用强,但副反应较多,其呼吸抑制作用曾限制了它在儿科的应用。
“一笔抹杀”是个常用的成语,意思是指把成绩、优点全部勾销或全盘否定,一般不用于否定错误或罪行。例如:①然而新的批评家不开口,类似批评家之流便趁势一笔抹杀。(鲁 “De
课程建设是高等职业学院教学基本建设中最具基础性的核心工作,其水平、质量和成果是衡量学校办学水平和教学质量的重要标志。加强课程建设是深化教学改革,实现培养目标的保证
中国计算机用户协会上海分会于1982年11月2日至4日在苏州市东山举行年会.参加本次年会代表169名,共收到90多篇论文,绝大部分在各专业组作了专题发言.通过这次年会,用户间建