论文部分内容阅读
一九八四年十月十六日至十八日在辽宁省盘山机械厂召开了新产品JB/ZQ4008—84塑料管夹技术和投产鉴定会。会议由辽宁省机械厅组织,机械工业部重型矿山机械工业局有关人员参加了这次会议,与会者有代表35个单位的专家和领导,共计50人。会议对新产品塑料管夹的各项技术性能指标及生产条件做了认真的审查,经过充分的讨论,做出了鉴定结论:认为该产品的设计、制造、工艺、工装等技术文件齐全;有关文件和产品图样贯彻了上级标准;试验项目及试验报告基本完整。产品符合JB/ZQ4008—84标准规
From October 16th to 18th, 1984, the new product JB/ZQ4008-84 plastic pipe clamp technology and production verification meeting was held in Panshan Machinery Plant, Liaoning Province. The meeting was organized by the Machinery Department of Liaoning Province, and the relevant personnel of the Heavy Mining Machinery Industry Bureau of the Ministry of Machinery Industry participated in the meeting. Participants represented 35 experts and leaders, totaling 50 people. The meeting carefully reviewed the technical performance indicators and production conditions of the new product plastic pipe clamps. After sufficient discussion, it made an expert conclusion: the design, manufacturing, process, and tooling of the product are complete; The documents and product drawings implement the superior standards; the test items and test reports are basically complete. Product complies with JB/ZQ4008-84 standard