南桠河冶勒、姚河坝水电站装机容量分别为24万kW和13.2万kW,初步设计报告分别于1991年9月和1992年7月通过审查。为加速该河梯级电站的开发,中国国际工程咨询公司应四川省电力局邀请,于1992年10月7日~14日在成都主持召开了有13位专家和国家能源投资公司领导、四川省有关部门代表参加的“冶勒、姚河坝水电站咨询调研会”,目的是为日后的正式评估打下良好的基础。会议针对两电站的经济评价和主要技术问题进行了咨询,在公正、科学、技术可靠的基础上,通过深入讨论和研究,对我院的设计成果给予
The installed capacity of Yeluo and Yaoheba hydropower stations in Nanluohe River were 240,000 kW and 132,000 kW, respectively, and preliminary design reports were reviewed in September 1991 and July 1992 respectively. In order to accelerate the development of the cascade hydropower station at the river, China International Engineering Consulting Corporation was invited by the Sichuan Provincial Electric Power Bureau to host 13 experts and leaders of the National Energy Investment Corporation in Sichuan from October 7th to 14th, 1992. The “Yele and Yaoheba Hydropower Station Consultation Research Team” attended by representatives of the department aims to lay a good foundation for future formal assessment. The conference conducted consultations on the economic evaluation and major technical issues of the two power plants. Based on fairness, science, and technical reliability, the conference provided in-depth discussion and research on the design results of our institute.