论文部分内容阅读
埃塞俄比亚蒂斯阿比水电站机电设备的全面检修 ,将增加其年发电量 ,提高可靠性 ,并使电站预期使用寿命增加 15~ 2 0a ,介绍该电站修复工程的设计和施工。
The comprehensive overhaul of the electrical and mechanical equipment at Desi Abi Hydropower Station in Ethiopia will increase its annual generating capacity, increase reliability and increase the expected service life of the plant by 15-20 years, introducing the design and construction of the power station rehabilitation project.