A simplified approach for settlement calculation of pile groups considering pile-to-pile interaction

来源 :中南大学学报(英文版) | 被引量 : 0次 | 上传用户:xiaodong0814
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A simplified approach is presented for the analysis of the settlement of vertically loaded pile groups.In order to simulate the nonlinear pile-to-pile interaction in pile groups,the soils along the piles are assumed to behave as a series of nonlinear springs subjected to the shaft shear stress at the pile/soil interface.Considering the displacement reduction induced by the pile-to-pile interaction,the shear-deformation method is adopted to approximate the displacement field of the layered soils around the piles,and the equivalent stiffness of the springs is obtained.Furthermore,the load-settlement response of pile groups is deduced by modifying the load-transfer functions to account for the pile-to-pile interaction.The settlements of a laboratory pile groups computed by the presented approach are in a good agreement with measured results.The analysis on contrastive parameters shows that the settlements of pile group decrease with the increase of the pile space and pile length,and the part of piles exceeding the critical pile length has little contribution to the bearing capacity of the pile groups.
其他文献
初试锋:苦练写作打基础rn我是1979年春节后开始任教的,距今已有37年.除了教过两年半小学语文,其余都是教初中.我似乎天生就是教书的料,任教半年,就引起片区的关注——两次统
“历史的温度——中央美术学院与中国具象油画展”研讨会于2015年4月29日下午13:30-17:30,分为两场在上海中华艺术宫举行。第一场研讨会由中央美院邵大箴教授担任学术主持。
期刊
1 病例rn患儿,男,9岁.主因间断血尿1年,加重伴水肿5d入院.患儿于1年前因鼻塞、额部疼痛,在当地医院给予静脉滴注青霉素后出现眼睑水肿,不伴恶心、呕吐、尿少等症状.当时查尿
浙江沿海和上海地区的一些高层建筑基础设计时。往往遇到柱或剪力墙底轴力的取值问题,特别是在风荷载较大而地震设防烈度相对不大的情况下,如何合理取值,更是基础设计关键所
OSHMS是一套系统化、程序化、文件化,具有高度自我约束、自我完善机制的科学管理体系.建立OSHMS,有利于提升企业形象和管理水平.济南钢铁集团总公司建立了OSHMS,现结合济钢实
期刊
为适应现代化管理及安全防范的需要,对办公大楼实施综合布线系统工程,以使其成为拥有先进的办公自动化系统、计算机网络系统和通信视频监控系统等于一体的智能化办公大楼。为
本文以Kubelka-Munk理论为基础,对紧凑型荧光灯荧光粉层-氧化铝保护膜层的光学特性进行了分析。在一定的粒度下,计算出了最佳的荧光粉层及保护膜层的厚度。采用保护膜层后,只要用