5南沙开发区采石场复绿施工的一般程序和技术要求5.1一般程序5.1.1施工准备5.1.1.1图纸交底发现图纸有错误时,应及时向设计单位和建设单位提出。5.1.1.2调查研究1.现场地形及现有建筑物和构筑物的情况;2.工程地质与水文地质资料,气象资料;3.工程用地、交通运输及排水条件;4.施
5 General Procedures and Technical Requirements for Quarry Greening in Nansha Development Zone 5.1 General Procedures 5.1.1 Construction Preparation 5.1.1.1 If the drawing is found to be in error, it shall be promptly submitted to the design unit and the construction unit. 5.1.1.2 Investigation and Research 1. Site topography and the existing buildings and structures; 2. Geological and hydrogeological data, meteorological data; 3. Engineering land, transportation and drainage conditions; 4. Application