论文部分内容阅读
我站于1967年投产,装机11台,总功率1.444千瓦,从右江4级提水,总扬程66.8米,设计抽水流量2.2立方米/秒。几年来,我们发动全站职工大搞技术革新,取得了改装电动闸阀、改造泵房、加装轴套、改革滤栅、巧添轴承、废套更新、自动控制二级站运行和自制“电梯”、电锯、搅拌机、切蔓机、打砖机等12项技术革新成果。全站机泵安全运行13年,灌溉面积由建站初期的1.5万亩扩大到2.49万亩,超过设计效益8%。灌区粮食亩产,从1972年起连年超千斤,1977年总产量比建站前翻了三番。实践证明,电力排灌站大搞“双革”,潜力大,门路广,事半功倍,大有可为。下面简要介绍我站主要革新项目的技术要点。
I stand in 1967 put into operation, installed 11 units, a total power of 1.444 kilowatts, from the Youjiang 4 to lift the water, the total lift of 66.8 meters, the design pumping flow of 2.2 cubic meters / second. Over the past few years, we launched the entire station workers engage in technological innovation, made the modification of electric gate valve, the transformation of the pump house, the installation of bushings, the reform grating, clever Tim bearing, scrap update, automatic control of secondary station operation and self-made “elevator ”, Saws, mixers, cut Man machine, brick and other 12 technological innovations. The whole station pump safe operation of 13 years, irrigated area from the initial construction of 1.5 million mu to 2.49 million mu, more than 8% of design efficiency. Irrigation area of grain per mu, year after year since the thousand kilograms in 1977, total output more than tripled before the establishment of the station. Practice has proved that the power station irrigation station vigorously “double leather”, great potential, wide access, more with less, promising a bright future. The following briefly introduces the main technical innovation of my station project.