辽宁某门窗加工厂金龙问: 我厂于1994年9月24日与大连某建筑公司签订了一份购销合同,约定我厂按照对方提供的规格型号、数量、质量为其加工生产塑钢窗,计总金额187195元,铝合金门连窗计总金额76422元,两项合计为263617元,工期为15天。因考虑不周,合同未规定违约条款。合同签订后,我厂立即投入加工生产。但是,当生产进行到一周的时候,对方却通知我厂立即停工,加工件全部改为铝合金。考虑到双方的合作关系,我厂同意了。经双方口头协商,价格定为230元1平方米,我厂也按期履行了合同。然而,当我厂要求最后结算的时候,对方却矢口否认双方协议的价格,至今仍拖欠我厂约20万元的价款。因此,我们决定起诉。现有以下争议问题请教:1.该合同应属于何种性质的合同?2.双方口头约定的价款是否合法?3.对方应承担什么样的违约责任?4.我厂能否要求对方赔偿因其改变产品材料而造成的实际损失?
Jinlong, a door and window processing factory in Liaoning Province, Q: Our factory signed a purchase and sales contract with a construction company in Dalian on September 24, 1994. It stipulated that our factory will manufacture plastic steel windows according to the specifications, quantity and quality provided by the other party. The total amount of 187,195 yuan, the total amount of aluminum alloy doors and windows with a total amount of 77,422 yuan, the two total of 263,617 yuan, the duration of 15 days. Due to poor consideration, the contract did not provide for default terms. After signing the contract, our factory immediately put into production. However, when the production went on for a week, the other party informed the factory that it should stop work immediately and all the processed parts should be changed to aluminum alloy. Taking into account the cooperation between the two sides, I agreed. The two sides verbal consultations, the price set at 230 yuan 1 square meter, I plant also fulfilled the contract on schedule. However, when I asked for the final settlement of the factory, the other side denied the price of the agreement between the two parties and still owes me about 200,000 yuan. So we decided to sue. The following existing controversial issues to ask: 1. The contract should belong to what kind of contract? 2. The two sides verbally agreed price is legal? 3. The other party should bear what kind of liability for breach of contract? 4. The actual loss caused by changing the product material?