上中路隧道作为中环南段的越江节点工程 ,其建成后 ,能否最大限度地发挥中环主线的交通效益 ,有效地减轻邻近越江设施的交通压力 ,减少对周边地区的交通冲击 ,关键之一在于越江隧道出入口及周边道路的交通组织设计。本次设计从整体出发 ,研究隧道出入口及周边路网的关系 ,调整周边道路功能 ,保证中环线主线和上中路隧道交通通畅 ;从局部入手 ,通过隧道入口设计、调整交通控制策略等手段 ,消除隧道与相接道路及周边道路的交通瓶颈 ,满足周边地区过江的需求 ,减少隧道交通对周边地区交通的冲击。
As a cross-river node project on the southern section of Central China, the construction of Upper Middle Road Tunnel as a cross-river node project will enable it to maximize the transport benefits of the Central Main Line and effectively reduce the traffic pressure on the adjacent cross-river facilities and reduce the traffic impact on the surrounding areas. Traffic Organization Design of Crossing the Tunnel Entrances and Surrounding Roads. Based on the overall situation, this study examines the relationship between tunnel entrances and exits and the surrounding road networks, and adjusts the functions of the surrounding roads to ensure smooth traffic flow between the main line of the Central Ring Road and the Upper Middle Road. Starting from the local areas, the tunnel entrance design and traffic control strategy are adjusted to eliminate The traffic bottlenecks between the tunnels and the adjacent roads and the surrounding roads can meet the demand of crossing the river in the surrounding areas and reduce the impact of tunnel traffic on the traffic in the surrounding areas.