390MW汽轮发电机定子线圈TU2铜接头在焊接前的预热过程中产生表面起泡现象,经过分析表明:在中频感应预热后产生表面起泡的失效原因是390MW定子线圈TU2铜接头材料含有一定量的氧和热锻工艺采用水煤气(H2+CO)加热所致。为消除由“氢气病”引起的起泡现象,应采用含氧量更低的无氧铜用于390MW定子线圈TU2铜接头上,或者是将铜接头的热锻加热方式改为电阻炉加热。
390MW turbine stator coil TU2 copper joints in the preheating process before welding surface blistering, the analysis showed that: IF induction heating surface blister failure caused by the 390MW stator coil TU2 copper joint material contains A certain amount of oxygen and hot forging process using water gas (H2 + CO) heating due. In order to eliminate blistering caused by “hydrogen sickness”, oxygen-free copper with a lower oxygen content should be used on the 390MW stator coil TU2 copper connector or the hot-forging method of the copper connector should be changed to a resistance furnace heating.