论文部分内容阅读
通过港口码头桩基础工程的泥浆护壁成孔工艺分析,提出解决在钻孔过程中对流沙及大颗粒卵石悬浮排清问题的方法。
Through the analysis of the technology of forming the mud retaining wall of pile foundation in the port dock, a method to solve the problem of floating and settling of quicksand and large-sized pebbles during drilling is put forward.