论文部分内容阅读
上海电视台是大家熟悉的一座具有40多年历史的老电视台,今天它的新大楼就座落在威海路上,阵阵梅雨不断冲刷着大厦的墙面,使大厦更加洁白,清新。 为了探究上海电视台的新要求、新举措、新设备、我们和电视台的弱电工程师们进行了交流和参观。 上海电视台新大厦楼高125米,是一幢集办公、银行、餐饮、娱乐和会议于一体的综合性大楼。在信息时代为特征的上海电视台要传输各种信息,信息量大又要传输速度快,而且其中图像居多,实时要求严格,不允许在传输信号时有分秒的丢失,这就需要铺设信息高速公路——出现了综合布线系统,电视台的领导认识到为了完成新时期对电视节目制作更高要求,要用先进的信息产品武装自己,用先进的技术去推动和完成节目质量的提高。综合布线在大楼中就像一根中枢神经,连接着大楼中各层次的各种系统。目前在综合布线方面技术已
Shanghai TV Station is an old TV station with a history of more than 40 years. Today, its new building is located on Weihai Road, and Meiyu continues to wash the walls of the building to make the building more white and fresh. In order to explore the new requirements, new measures, new equipment of Shanghai TV Station, we exchanged and visited the weak engineers of the TV station. The new building of Shanghai TV Tower is 125 meters high. It is a comprehensive building integrating office, banking, dining, entertainment and conferences. The Shanghai TV station, which is characterized by the information age, needs to transmit various kinds of information. It has a large amount of information and requires fast transmission. Moreover, most of the images are in real-time and require strict requirements in real time. It is not allowed to lose minutes and seconds when transmitting signals. This requires the laying of information at high speeds. Highways - An integrated cabling system emerged. The television station’s leaders realized that in order to complete the higher requirements for TV program production in the new era, armed with advanced information products, advanced technology was used to promote and complete the improvement of program quality. The integrated wiring in the building is like a central nervous system, connecting various systems at various levels in the building. At present, the technology in integrated wiring has been