水布垭工程溢洪道砼施工的主要起重设备布置、安装方案的优化

来源 :建设机械技术与管理 | 被引量 : 0次 | 上传用户:jdsheny
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
清江水布垭水利枢纽位于湖北省巴东县境内,上距恩施市117km,下距隔河岩水利枢纽92km,是清江梯级开发的龙头枢纽。水库总库容45.8亿m3,系多年调节水库,正常蓄水位400m,相应库容43.12亿m3,总装机容量1600MW。 Qingshui Shuibuya Water Control Project is located in Badong County, Hubei Province. It is 117km away from Enshi City and 92km away from Geheyan Water Conservancy. It is the leading hub of cascade development in Qingjiang. The total reservoir capacity of 4.58 billion m3, Department of regulation of reservoirs for many years, the normal water level 400m, the corresponding storage capacity of 4.121 billion m3, with a total installed capacity of 1600MW.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
Human communication operates over a variety of modalities between humans and computers. When we communicate with other people and with information systems, we e
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
上世纪九十年代,欧洲商业银行中一场影响深远的机构管理体系变革成为势不可挡的潮流,撼动了商业银行流行已久的,以地域“区块”层级分别设置组织管理中枢的分、支行体制,使一种全
学位
讨论了利用多模式接口技术处理异种语言模式交流的问题.作为连接聋哑人和听力正常人的一个桥梁,我们将手语识别、手语合成、唇读、人脸特征检测以及特定人面部动画相结合,构
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
《义务教育语文课程标准》明确指出:“小学语文课堂评价是小学语文课堂教学的重要环节,直接影响着教学目标的达成.教学评价能够发现和发展学生多方面的潜能,了解学生的需求,
期刊
学位