2011年12月9日是载入中国电力工业建设史的一天,被誉为“电力天路”的青藏直流联网工程在宣布工程投入试运行,结束了西藏电网长期孤网运行的历史,标志着我国内地电网全面互联,也为从根本上解决西藏城乡居民生活和工农业生产用电问题打下了基础。在高寒缺氧的恶劣环境中,电力建设者们超越生命极限,弘扬攻坚克难、敢打硬仗的精神,在一年多时间里为雪域高原架起了的电力“彩虹”。
December 9, 2011 is one day into the history of the construction of China’s power industry, known as “Power Road ” of the Qinghai-Tibet DC networking project announced the project put into trial operation, ending the long history of Tibet power grid operation, Marking the full interconnection of the power grid in the Mainland of China and laying a foundation for fundamentally solving the problems of urban and rural residents living in Tibet and the electricity used in industrial and agricultural production. In the harsh environment of high altitude and anoxia, power builders surpass the limit of life, carry forward the spirit of tackling hardships and brave battles, and power “Rainbow” for the snowy plateau over more than a year.