论文部分内容阅读
垃圾池是垃圾焚烧发电厂的最重要的组成部分。垃圾池的体型比较大,占地面积比较大,深度最高,一般情况下位于厂房的中间部位,在垃圾池的周边一般存在建筑物。在垃圾焚烧发电厂垃圾池施工过程中,垃圾池与周边的建筑物能够一起施工,从而对施工周期进行缩短,一般情况下使用钢板桩+支撑+井点降水的施工方案、垃圾池基础底板施工法案、垃圾池上面池壁施工法案,在经过验证之后,使施工能够安全进行,对质量和进度能够得到保障,并且在经济效益方面能够有较好的收益。
Garbage dumps are the most important part of a waste incineration plant. Garbage larger size, covers an area larger, the highest depth, under normal circumstances is located in the middle of the plant, generally exist in the vicinity of the garbage pond buildings. In the garbage incineration power plant garbage pond construction process, the garbage pond and the surrounding buildings can be constructed together to shorten the construction period, under normal circumstances the use of steel sheet pile + support + well point of the construction program, the base construction of garbage basins The bill, the pool wall construction bill above the refuse pool, has been verified to enable construction to be carried out safely, with quality and progress guaranteed, and with good economic returns.