论文部分内容阅读
我所自1981年建立以来,陆续从水电设计、施工、安装、试验等部门调集技术人员,拥有先进测试手段,以水电站的机电运行技术改造和机电安装新工艺的研究为目标,并设有试验工厂,竭诚为水力发电事业服务,其项目有: 一、水电站机电设备、自动化的技术改造、改进和机电安装新工艺的研究及技术咨询。设备的振动,应力测定,流量测试及电气调试。
Since its establishment in 1981, our institute has successively mobilized technicians from hydropower design, construction, installation and testing departments and advanced test methods, aiming at the research on the technological transformation of electromechanical operation and the new electromechanical installation process of hydropower stations, Factories and dedicated service to the cause of hydroelectric power, its projects are: First, the hydropower station mechanical and electrical equipment, automated technological transformation, improvement and installation of new mechanical and electrical technology research and technical advice. Equipment vibration, stress measurement, flow testing and electrical debugging.