苏州轨道交通1号线三元村车站须穿越高架桥,在施工中,通过对围护结构进行设计优化,加快了施工进度,节省了施工成本,规避了施工风险。
Sanyuancun Station of Suzhou Metro Line 1 must pass through the viaduct. During construction, design and optimization of the envelope structure has accelerated the construction progress, saved the construction cost and avoided the construction risk.